In saying that
there must be a ‘business case’ for extending electrification to Swansea this week, the
Secretary of State has not really said anything new. The question needs to be asked however – how long
does it take to produce one, and why hasn’t it been done yet? After all, they’ve been in power for two
years now, and as I recall, there have been some sort of figures produced before. Does it really take two years just to review
and update work done previously?
Personally, I’m not
a huge fan of the vogue for producing ‘business cases’ in any event. There’s nothing wrong with the concept, but
as someone who’s produced more than a few of them over the years, I’m well
aware that they have more to do with justifying why the preferred option is the
right one than with an objective analysis of the options. I wouldn’t say that creative writing is the
most important skill in drawing up such a document, but it’s up there
somewhere.
Figures in
themselves are an important part of any story; but they rarely tell the whole
story. And many figures are the result
of estimates, which themselves depend on assumptions, which in turn depend on
prejudices and preconceptions. In this
case, it seems to me that the government is using the current absence of a
business case as a fig leaf behind which to hide whilst they continue to delay.
Another way in
which the use of business cases can be used to obfuscate rather than clarify is
in the definition of a project. In the
case of rail electrification, the requirement to produce a separate case for Cardiff -Swansea
electrification will produce a different answer than if that section were
included in a single case for the whole route from Paddington – Swansea. So the person who decides where to draw the line
between projects has a great deal of influence on the final outcome.
It might be argued
that splitting the project up into a number of smaller sections is a valid way
of determining which bits are or are not viable, but to take that to extremes,
a mile by mile analysis would almost certainly conclude that no individual mile
was worth electrifying. And even if the
route is split more rationally into station-station sections, the viability of
each section will also to an extent depend on what decision is taken in regard
to other sections.
The real decision
which Gillan and the Government need to justify is the arbitrary one they took
to electrify only part of a major route in the first place. There is a difference between seeing individual
projects as part of a wider project to electrify the whole system and seeing it
as just a series of projects each of which must be individually justified, and
the latter seems to be the view of the government. It’s a short-sighted way of looking at the
question.
6 comments:
I asked a question, some time ago, never seen an answer. What is the difference between electrifying the extra miles to Swansea and the extra cost of the duel energy (electric and diesel) trains that will be required if we don't? anyone out there answer it?
John
Re Gyndo
Try Bombardier 4LP-45DP as used by New Jersey and Montreal This train may prove of interest to Wales A few emails should set some bench marks re Price and operating costs
John
Apologies Train is the ALP-45DP
John and Gyndo....Surely it should be up to the Secretary of State to justify the bi-modal (diesel and electric traction) rolling stock that would be required to run the GWML if Swansea was NOT electrified. The additional cost of this on the locomotives to be bi-modal is estimated at £59million, just short of the estimated additional £65million cost of full electrification. I had thought of going to London to tell the Secretary of State myself, but I didn't fancy roast beef with custard for lunch and having to sit on her chair-table. A lesson in business - when you are a going concern, a 'business case' is a balancing process of doing something compared with NOT doing something. What's her numbers?
HJ - Comparison of the ALP-45DP to the Hitachi 395s already in service on HS1 identifies severe loss of efficiency by incorporation diesel motors. 125/140mph, 50%/75% power to traction efficiency, 4400kwe/3360kwe at 0.7m/s² acceleration. Both due to extra weight of diesel engines and configuration head end transformers.
I would be intrigued to see the business plan for the tunnel being built to keep HS2 out of view of Cheryl's house!
A business plan was submitted in October 2011. All that is lacking is an effective voice for Wales at the cabinet table.
Apologies for the delay in publishing the last three comments here; holidays intervened...
Post a Comment